Overview
British Sugar (Cantley) are working through a campaign to update and modernise their industrial processing working towards minimising their carbon footprint as much as possible and increasing the efficiency of their plant.
This has led to the replacement of a coal fired boiler and a gas fired package boiler with a new and modern CHP scheme powered by a CX300-1S gas turbine generator set.
Key points
- Reduced emissions
- Modernised industrial processing
- Increased efficiency
- Minimising carbon footprint
Technical information
Generator set
Centrax Gas Turbines
Generator
Nidec 11kV
Type
CX300-1S
Core engine
Siemens SGT-300-1S
Nominal Output
7.9MW
Fuel
Gas